ISO 9001 Certified

Insulated Pipe Support · Extra Heavy Bottom Jacket

A3000

A medium-duty, pre-insulated pipe support for hot, cold, and chilled lines – with a double-thickness bottom jacket that adds structural strength and wear resistance on flat surfaces, hangers, and pipe rolls.

Load Rating40–2,400 lbs
Pipe Sizes½" – 24" IPS

Talk to a pipe support specialist about your application.

1-707-447-5014

General Dimensions & Specifications

A3000 insulated pipe support

A3000 assembly

Hardware sold separately.
Note: For higher load ratings, see A5000, A9000.

Cross section

Dimension A

Oper.
Temp.
°F
Mult.
Factor
“F”
500 0.90
750 0.75
1000 0.50
1200 0.30
TABLE III
Pipe
Size
MAXIMUM LOAD
RATING (LBS)
On Flat
Surface
(a) (d)
On Pipe
Roll
(b) (d)
In Ring
or Clevis
Hanger
(c) (d)
1/2 40 35 45
3/4 45 40 50
1 65 60 70
1 1/4 80 70 90
1 1/2 110 100 120
2 140 125 155
2 1/2 165 150 220
3 200 180 275
3 1/2 250 225 325
4 300 270 375
5 400 See

A5000

475
6 450 575
8 500 800
10 525 1100
12 575 1300
14 600 1500
16 625 1700
18 650 1900
20 700 2100
24 775 2400
TABLE I

Contact factory for other dimensions,
temperatures, and loads.

Available in all insulation thicknesses.

The load ratings represent average values obtained in accordance with accepted
methods and are subject to normal manufacturing variations. Dimensions and ratings
are subject to change without notice.

a) To develop maximum load rating, width of support surface should be at least 1/2 of dimension “A” in Table II.

b) Divide “A” in Table II by 6 to find maximum allowable travel on pipe roll (+/- from centered position).

c) To develop maximum load rating, use band, ring or clevis hanger with manufacturer’s load rating equal to or greater than values shown in Table I.

d) To obtain load ratings for operating temperatures of 500° F and higher, multiply load rating by factor “F” in Table III.

Iron
Pipe
Size
Insulation Thickness Copper
Tubing
Size O.D.
1/2 3/4 1 1 1/2 2 2 1/2 3 3 1/2 4
A B A B A B A B A B A B A B A B A B
1/2 – 1 1/2 4 24 4 24 4 24 4 24 4 24 4 24 6 24 6 24 6 24 5/8 – 1 5/8
2 6 24 6 24 6 24 6 24 6 24 6 24 6 24 6 24 6 24 2 1/8
2 1/2 – 4 6 20 6 20 6 20 6 20 6 20 6 20 9 20 9 20 9 20 2 5/8 – 4 1/8
5 6 20 6 20 6 20 6 20 9 20 9 20 9 20 5 1/8
6 – 7 6 20 6 20 6 20 6 20 9 16 9 16 9 16 6 1/8
8 – 10 9 16 9 16 9 16 9 16 9 16 9 16 8 1/8 – 10 1/8
12 – 18 12 16 12 16 12 16 12 16 12 16 12 16 12 1/8
20 – 24 18 16 18 16 18 16 18 16 18 16 18 16
TABLE II   “B” = gauge of sheet metal jacket
(bottom jacket approx. 2 X ga. of top jacket)

Application

Model A3000 is designed for use on:

  • Hot water
  • Cold water
  • Chilled water
  • Dual temperature
  • Steam
  • Air
  • Gas
  • Vacuum

Intended for installation on:

  • Flat surfaces
  • Pipe rolls
  • Band, ring or clevis pipe hanger

Temperature Range

Standard: +40°F to +1200°F CalSil Insulation

Note: Up to 1800°F available upon request.

Cryogenic: -275°F to +275°F Urethane Insulation.

Add U after the model number (i.e., A3000U)

Features

  • Compact
  • Easy installation
  • Eliminates welding to pipe
  • Overlapping galvanized sheet metal jacket
  • Minimizes heat loss and/or condensation
  • Double thickness bottom jacket for added structural strength and abrasive wear resistance
  • Copper tubing sizes available
  • Other I.D.’s and/or O.D.’s available on request
  • Clamps available (see G-series)
  • Clevis available (see PTP fig. 83)

Performance test results on file – available upon request.

Material Data

A3000 Spec Doc Applicable PSI spec. doc.: No. 205
Insulation Calcium silicate, asbestos-free, treated with water repellant
Jackets Galvanized steel, ASTM A-653
Glue Industrial contact adhesive

Need a formal submittal?

Formal submittal sheets available.


Request a Quote


Custom Design Request

Installation Guide

Installation Model A1000 - A4000 & A9000

Model A1000 – A4000 & A9000

1. Position the bottom half of the insulated hanger shield (insulating structural material, sheet metal jacket and load plate where applicable) on the pipe at the applicable support location as shown.

2. Hold the top half of the shield firmly. Open the overlapping sheet metal jacket and gently slide into position the top half of the insulated shield over the bottom half shield as shown.

Installation Model A5000 - A8400

Model A5000 – A8400

1. When used on a flat surface, position shield so that it is centered on the structural steel.

2. When used with a clevis hanger, position shield symmetrically.

3. When models include heat trace groves, the number and location may vary. Check with design drawings for exact number and location. Ensure that the heat tracing cable is properly positioned inside the grove of the shield.

Completed assembly without load plate

Completed Assembly Without Load Plate

Completed assembly with load plate

Completed Assembly With Load Plate

Downloads & resources

Form
Custom Design Request

Need other I.D.'s, O.D.'s, temperatures or loads? Submit a custom design request.

Start Request →
RFA
Revit RFA 3D Model

A1000 Insulated Pipe Support Revit RFA model for BIM & coordination workflows.

Download 3D Model →
Meet
Schedule a Meeting

Talk through your application with a Pipe Shields engineer.

Book a Time →
Top