Pipe Shields

   Manufacturers of insulated pipe supports, hot shoes and cold shoes since 1971

Loading
 
Call Us: (800) 538-7007   Se habla español
 

 
 

Pipe Shields A1000 through A9000 Insulated Support Installation Instructions

a1000-a4000-a9000

    Model A1000 - A4000 & A9000

Installation Steps

  1. Position the bottom half of the insulated hanger shield (insulating structural material, sheet metal jacket and load plate where applicable) on the pipe at the applicable support location as shown.


  2. Hold the top half of the shield firmly. Open the overlapping sheet metal jacket and gently slide into position the top half of the insulated shield over the bottom half shield as shown.

a5000-a8400

    Model A5000 - A8400

Notes:

  1. When used on a flat surface, position shield so that it is centered on the structural steel.
  2. When used with a clevis hanger, position shield symmetrically.
  3. When models include heat trace groves, the number and location may vary. Check with design drawings for exact number and location. Ensure that the heat tracing cable is properly positioned inside the grove of the shield.

  Completed assembly without load plate       

         Completed Assembly Without Load Plate                           Completed Assembly With Load Plate    

completed assembly with load plate

 

 

Parent Company: Piping Technology: Pipe Supports, Pipe Clamps, & Pipe Hardware
Fellow Subsidiaries
U.S. Bellows: Metallic & Fabric Expansion Joints, Bellows
Sweco Fab: ASME Vessels, Pig Launchers, Spectacle Blinds

Pipe Shields: Pre-Insulated Pipe Supports, Slides, Guides & Anchors
Fronek Anchor/Darling
: Snubbers, Sway Struts & Sway Braces
Contact Us: 707-447-5014 Toll Free1-800-538-7007. info@pipeshields.com

Copyright 2017 Pipe Shields, Inc. All Rights Reserved. Contact Us | Privacy Policy